Day 30


Dsc00363s Dsc00361s Dsc00362s

A bit more plastering was done and rendering to the outside.  The tiles were laid and grouted  as far as possible due to the fact that the whole in the boiler cupboard still needs filling in in order to complete the tiling.  the boiler and pipes are now done and the under floor heating was tested.