Day 32
Posted by Claire in New Kitchen on April 3rd, 2009
Kitchen fitters arrived and within minutes the kitchen units were in. We decided after recommendation from our builder to have the wall brought forward to bring it in line with the new extension. This is purely cosmetic but worth the extra cost in our opinion.
Security camera fitted at front of property. Even more cabling done and some conduit fitted to hide the wires. If you look carefully at one of these pictures there is a jelly dummy hiding in the saw dust.
Day 31
Posted by Claire in New Kitchen on April 3rd, 2009
Outside render completed. Internal damp proof screed applied to kitchen wall. sockets moved to cater for TV lift mechanism. Pipe work buried in boiler room. Other kitchen wall patched and skimmed. Security camera fitted at rear. Lots more network cable fitted.
Day 30
Posted by Claire in New Kitchen on April 2nd, 2009
A bit more plastering was done and rendering to the outside. The tiles were laid and grouted as far as possible due to the fact that the whole in the boiler cupboard still needs filling in in order to complete the tiling. the boiler and pipes are now done and the under floor heating was tested.