French doors are installed and more of the soffits replaced.
The landing window is boarded up and the window taken away to be resized.
The kitchen is almost totally re plastered and the new boiler connected. However, there is still more work to be done with regards to the new pipe work.
Kitchen door is taken away to be altered so it hangs the other way