Day 26


Dsc00315s  Dsc00314s Dsc00312s

The floor insulation is put down and then the red plastic is then placed on top.  The pipe is then laid out as per the map provided by Polypipe which is calculated to give the correct BTU rating.  Also today the soffits etc where removed from the exterior of the whole house.