Day 23


A start to the network cables being installed.

Dsc00286S Dsc00287S Dsc00288S Dsc00289S

Sand laid down and preparations for the concrete base to be poured in the kitchen with some more electrics done.

Dsc00290S Dsc00291S Dsc00292S Dsc00293S Dsc00294S

First coat of render to extension.

Dsc00296S Dsc00295S

  1. No comments yet.

You must be logged in to post a comment.

  1. No trackbacks yet.