Day 23
- No comments yet.
- No trackbacks yet.
A start to the network cables being installed.
Sand laid down and preparations for the concrete base to be poured in the kitchen with some more electrics done.
First coat of render to extension.
This entry was posted on Tuesday, March 24th, 2009, 10:44 pm and is filed under New Kitchen. You can follow any responses to this entry through RSS 2.0. You can leave a response, or trackback from your own site.
You must be logged in to post a comment.
Fusion theme by digitalnature | powered by WordPress
Entries (RSS) and Comments (RSS) ^