Day 6
- No comments yet.
- No trackbacks yet.
Paul called at approx. 10am to say men would be at the house at 1pm to prepare slab. Building inspector due tomorrow afternoon to check work before slab goes down. Delivery arrived approx. 2pm and ground works prepared.
This entry was posted on Monday, March 2nd, 2009, 8:24 pm and is filed under New Kitchen. You can follow any responses to this entry through RSS 2.0. You can leave a response, or trackback from your own site.
You must be logged in to post a comment.
Fusion theme by digitalnature | powered by WordPress
Entries (RSS) and Comments (RSS) ^