
No Kevin today, Yarik arrived 9.00. On my return lots of pipework had been resited for the drains and concrete poured into the foundations.

No Kevin today, Yarik arrived 9.00. On my return lots of pipework had been resited for the drains and concrete poured into the foundations.
This entry was posted on Thursday, February 26th, 2009, 8:09 pm and is filed under New Kitchen. You can follow any responses to this entry through RSS 2.0. You can leave a response, or trackback from your own site.
You must be logged in to post a comment.
Fusion theme by digitalnature | powered by WordPress
Entries (RSS) and Comments (RSS) ^