Enya with football @ five and a half months

No Comments

So much ENERGY!!!

No Comments

Enya, Felicity and Amelia playing in the garden

2 Comments

Enya and Felicity in the DogLoo

No Comments

Enya Playing

No Comments

Enya and Anna playing

No Comments

First Video of Enya

No Comments

Enya Arrives

We took a while selecting Enya as there were 6 girl puppies to chose from, Amelia, Felicity and Claire all chose a puppy each then Stuart chose one of the three.

DSC00187

Enya

No Comments

Movie Time

 

No Comments

Day 2

Day trip with Reykjavik excursions exploring The Golden Circle.

No Comments

Day 1

Reykjavik here at last, wanted to visit since 1991! Today done nothing but eat, never eaten so many different foods in one day and some have never eaten ie charr – like salmon, puffin, lamb’s tongue, lemon foam, skyr dessert.

No Comments

Day 32

  Dsc00381s   

Kitchen fitters arrived and within minutes the kitchen units were in. We decided after recommendation from our builder to have the wall brought forward to bring it in line with the new extension. This is purely cosmetic but worth the extra cost in our opinion.

Dsc00385sDsc00380s Dsc00386s

Security camera fitted at front of property. Even more cabling done and some conduit fitted to hide the wires. If you look carefully at one of these pictures there is a jelly dummy hiding in the saw dust.

Dsc00384sDsc00383sDsc00382s

No Comments

Day 31

Dsc00373s 

Outside render completed. Internal damp proof screed applied to kitchen wall. sockets moved to cater for TV lift mechanism. Pipe work buried in boiler room. Other kitchen wall patched and skimmed. Security camera fitted at rear. Lots more network cable fitted.

Dsc00364s Dsc00365s Dsc00366s Dsc00367s Dsc00368s Dsc00369s Dsc00370s Dsc00371s Dsc00372s Dsc00374s Dsc00375s Dsc00376s Dsc00377s Dsc00379s Dsc00378s

No Comments

Day 30

Dsc00363s Dsc00361s Dsc00362s

A bit more plastering was done and rendering to the outside.  The tiles were laid and grouted  as far as possible due to the fact that the whole in the boiler cupboard still needs filling in in order to complete the tiling.  the boiler and pipes are now done and the under floor heating was tested.

1 Comment

Day 29

Dsc00352s Dsc00353s Dsc00354s

French doors are installed and more of the soffits replaced.

The landing window is boarded up and the window taken away to be resized.

The kitchen is almost totally re plastered and the new boiler connected.  However, there is still more work to be done with regards to the new pipe work.

Kitchen door is taken away to be altered so it hangs the other way

 

 

 

 

Dsc00355s Dsc00356s Dsc00357s Dsc00358sDsc00359sDsc00360s

No Comments

Day 28

Dsc00350sDsc00351s

No Comments

Day 27

 Dsc00322s

Floor screed is laid. Work commenced approx 8.15 and was finished before lunch.  Should be totally firm by Monday am.  The rest of the day more work was done outside on the soffits etc.

Dsc00318s Dsc00319s Dsc00320s Dsc00321s Dsc00324sDsc00325s

No Comments

Day 26

Dsc00315s  Dsc00314s Dsc00312s

The floor insulation is put down and then the red plastic is then placed on top.  The pipe is then laid out as per the map provided by Polypipe which is calculated to give the correct BTU rating.  Also today the soffits etc where removed from the exterior of the whole house.

No Comments

Day 25

Second coat of smooth render is applied.

Dsc00303s Dsc00304s

The plaster board makes such a difference to the overall look of the room.  It is starting to take shape.

Dsc00305s Dsc00306sDsc00307s

No Comments

Day 24

 Dsc00297s

Kitchen floor goes down and further electrics are installed both for hardwired network and kitchen lights and sockets.

Dsc00298s Dsc00299s Dsc00300s

Dsc00302s

1 Comment

Day 23

A start to the network cables being installed.

Dsc00286S Dsc00287S Dsc00288S Dsc00289S

Sand laid down and preparations for the concrete base to be poured in the kitchen with some more electrics done.

Dsc00290S Dsc00291S Dsc00292S Dsc00293S Dsc00294S

First coat of render to extension.

Dsc00296S Dsc00295S

No Comments

Day 22

Dsc00281s Dsc00275s

The rotten floor turned out not to be as rotten as expected

No Comments

Day 21

 

Dsc00223s

Part of the render on original part of the house is removed ready for new leadwork

Dsc00224s Dsc00225s

The earth moved, well some of it , i.e. the kitchen floor.  A few cracks have appeared in the shower room and back room due to the hammering and removing of the kitchen wall, hopefully these are superficial. Decorator called round and we discussed what was required for the kitchen in terms of wallpapering and paint.

Dsc00226sDsc00230s Dsc00227s Dsc00228s Dsc00229s

No Comments

Day 20

Velux goes in, should give plenty of light.

Dsc00222s Dsc00221s

More of the kitchen floor is dug up and finally the wall comes tumbling down, well perhaps is knocked down brick by brick.  It is now easier to visualise just how the new kitchen will look and gives a better idea of the size. The steel is now in place.

Dsc00217s Dsc00218s Dsc00219s Dsc00220s

1 Comment

Day 19

A bit more of the garage completed with a ceiling going in. The kitchen floor is broken up and the steel beam is put in.

Dsc00216s Dsc00212s Dsc00213s Dsc00214s Dsc00215s

1 Comment

Day 18

Dsc00201s 

 

Dsc00202s Dsc00203s Dsc00207s

By the end of today we looked as if we were ready to demolish the house, given the scaffolding surrounding the whole building.  I was surprised at the amount of work involved in erecting the scaffolding and how heavy it was.  The kitchen window was now in.

Dsc00204s Dsc00205s Dsc00206sDsc00210sDsc00211s 

Internally a new wall had been built and Acro props were holding up the ceiling, it all looked rather precarious.  Some electrics had also been done in the new extension.

The garage had also new electrics installed as well as a floor.

Again 4 vans and about 8 men at maximum capacity today.

Dsc00208s Dsc00209s

3 Comments

Day 17

Busy day again.  The opening was created for the French doors for the garage conversion.  This created a lot of red brick dust and over powering petrol fumes, but looking good.

The kitchen extension didn

No Comments

My party.

It is a swimming party

At:Bamber bridge leisure centre

time:4:50 to 7:00

                                       DO NOT LOSE THIS!

No Comments

Day 16

Dsc00187s

Roof tiles finished off by roofers on Saturday morning after Friday

No Comments

Day 15 – Friday the 13th

Dsc00182s

The great British weather effected play today and the tiling didn

No Comments

Day 14

Dsc00173s

 

Dsc00174s Dsc00175s

Garage door has now gone and they have made some wooden beams for kitchen ceiling

Dsc00176s Dsc00177s

Roof is now felted and battened. In the kitchen the floor tiles have been removed as has the coving.

 

Dsc00178sDsc00181s Dsc00179s Dsc00180s

No Comments

Day 13

Dsc00164s

Lots of men on site today doing the roof, progress made today in terms of fascia boards etc and velux

No Comments

Day 12

Dsc00160s Dsc00159s

More of the roof completed ready for felting and tiling, should be completed Friday.  Discussions re under floor heating, electric velux

1 Comment

Day 11

Dsc00151s

It was about 1pm before any work started this afternoon. By the end of the day the outline roof structure had been completed, ready for the roof trusses to go on. In the morning time was spent discussing progress to date, the garage conversion and requirements along with timings for the kitchen.  I expressed my reservations as to finishing the work in time for the kitchen being fitted on the 30th, as there is all the decorating to do, moving of pipes and false ceilings as well as tiling the floor.  Thus Paul said he would get the blue cupboard pulled out so work could commence.

Dsc00152s Dsc00153s

Thus contents of blue cupboard and garage are now in the dining room, which looks like a bomb site.

Whereas the garage now looks beautifully tidy and organised.  This is down to half filling a skip and spending 14 man hours clearing it out on Saturday.

Dsc00154s Dsc00155s

Dsc00156sDsc00157s

No Comments

Day 10

Dsc00147s

Dsc00146s

 

Today 8.15 builders were on site.  The guys who were knocking out the landing window also arrived putting down lots of polythene to protect everything. Unfortunately after removing the glass it was evident that the window could not simply be moved up several courses of brickwork, keeping it intact.  What happens next is still to be decided.  Tom arrived to discuss various aspects and talk to Les from Kam design. We discussed the size of the patio, quoting for soffits and barge boards for the rest of the rear of the house.  Paid the 2 invoices and gave Tom a large list of things to find out about.  By 2pm ish  all the building work was completed and work stopped for the day.  The plan is to discuss window options on Monday when Paul returns to work.  We gave go ahead for Garage conversion to start next week so will be busy clearing out garage this weekend.

Dsc00150s Dsc00148sDsc00149s

1 Comment

Day 9

Dsc00140s

Finished off tying block work into existing wall. Put in RSJ and completed doorway opening, moved soil pipe. Wood arrived ready for wall plates.

 Dsc00141s Dsc00142sDsc00143sDsc00145s

No Comments

My party.

Today it is not my birthday party.

But it is not a lot of days off.

So i am excited of going to it.

It is only on the 21st of march.

No Comments

Day 8

Dsc00136s

Today we have some of the white stuff

2 Comments

Day 7

Dsc00133s

The slab was prepared and checked by Planning Officer. The slab has made a great base for the outdoor swimming pool- lol.  It has rained for most of the day and has started to fill up with rainwater.

Dsc00134s Dsc00135s

No Comments

watching films on my laptop .

Me and my sis watched two very good films called Igor and fly me to the moon. They are both reccomended by me. Hope you watch them and have a nice day.

No Comments

Day 6

Dsc00129s Paul called at approx. 10am to say men would be at the house at 1pm to prepare slab. Building inspector due tomorrow afternoon to check work before slab goes down. Delivery arrived approx. 2pm and ground works prepared.

Dsc00131s

No Comments

my weekend

I went to my dads we went for a long bike ride .It was fun . we went to Botany bay just to have a look.

No Comments

Day 5

Dsc00128s

By 10 am still no sign of the builders. Rang Tom who said would get Paul to ring me. Received a call saying one of the workforce hadn

No Comments

Day 4

Day 4

Arrived 8.20am. Today they have cemented round all the drains and started building some of the walls of the new extension. Tomorrow is the slab going down.

Day 4 5pm 1 of 3Day 4 5pm 3 of 3Day 4 5pm 2 of 3

No Comments

Day 3

dsc00122s1

No Kevin today, Yarik arrived 9.00. On my return lots of pipework had been resited for the drains and concrete poured into the foundations.

No Comments

Day 2

Building inspector called and approved foundations although suggested we underpinned part of the corner of existing building – we agreed at extra cost. Large delivery arrived of blocks, sand , cement etc.

No Comments

Day 1

Plumber called round at the weekend, filling us with confidence that the build was going ahead as plannned.

No Comments

Before the work started

Before the build started

Before the build started

No Comments